  5. The 10 Most Common Causes of Air Leakage on Construction Projects

The 10 Most Common Causes of Air Leakage on Construction Projects (And How to Catch Them Early)

Key Takeaways

The same 10 details cause the vast majority of air leakage failures across Australian construction projects, regardless of building type.

Most of these leaks aren't caused by bad materials, they're caused by trade sequencing and unclear responsibility at junctions between trades.

Service, ceiling, and electrical penetrations are consistently the highest-frequency leak points because so many different trades pass through the same wall.

Catching these details at schematic design and during site audits is dramatically cheaper than finding them on final test day.

Every one of these 10 causes is preventable with the right detailing, sequencing, and a preliminary test before the formal AS/NZS ISO 9972 test.

Run enough blower door tests and a pattern shows up fast: it’s almost never the wall itself leaking. It’s the 10 places where something else, a pipe, a duct, a joint, a shaft, passes through it. These junctions get handed between trades, and air leakage is what happens in the gap between “someone else will seal that” and the final test.

Here are the 10 details that cause the majority of air leakage failures on-site, and what to watch for on your next project.

Why Air Leakage Keeps Happening on the Same 10 Details

Every one of these points has one thing in common: two different trades meet at the same junction, and neither one owns the airtightness outcome.

The plumber isn’t thinking about the air barrier. Neither is the electrician, the mechanical contractor, or the façade installer. That’s not a workmanship problem; it’s a coordination problem, and it’s exactly why Aerotight runs project workshops before a single wall goes up.

Mistake 01

Service Penetrations

Any pipe, cable, or service passing through the envelope creates a gap that has to be sealed on both sides, not just packed with insulation. Insulation stops heat transfer, it doesn’t stop air movement. This is one of the highest-frequency leak points on almost every project because there are simply so many of them.
Mistake 02

Window and Door Interfaces

The window or door unit itself is rarely the problem, it’s the interface between the frame and the surrounding wall structure. Membrane laps, sealant continuity, and correct sequencing (does the membrane go over or under the frame flange?) all matter more than the product spec.
Mistake 03

Façade Joints

Movement and expansion joints in the façade are designed to move, which makes them one of the hardest details to seal permanently. The wrong backing rod or sealant choice fails under thermal movement, reopening the leak path months after handover.
Mistake 04

Roof-to-Wall Junctions

This junction sits at the intersection of two completely different air barrier systems, wall and roof, usually installed by two different trades on two different schedules. If the two systems aren’t detailed to physically lap and connect, there’s a continuous gap running the length of the building.
Mistake 05

Lift Shafts

Lift shafts are notorious for air leakage because they’re often treated as a structural or fire problem, not an airtightness one. Shaft walls have multiple penetrations for controls, ventilation, and structural connections, and the shaft itself can act like a chimney, pulling air through any gap in the envelope around it.
Mistake 06

Expansion Joints

This junction sits at the intersection of two completely different air barrier systems, wall and roof, usually installed by two different trades on two different schedules. If the two systems aren’t detailed to physically lap and connect, there’s a continuous gap running the length of the building.

Mistake 07

Ceiling Penetrations

Downlights, sprinklers, exhaust fans, cable trays, HVAC diffusers: ceilings in commercial and residential builds alike are riddled with penetrations, and the ceiling plane is frequently treated as “not part of the envelope” when it absolutely is, especially in top-floor or single-storey applications.
Mistake 08

Mechanical Ductwork

Ductwork passing through the envelope needs an airtight seal around the duct itself, separate from the duct’s own internal air-tightness rating. These are two different requirements and it’s a common mistake to assume a well-sealed duct system means a well-sealed penetration.
Mistake 09

Electrical Penetrations

Conduits, cable trays, and switchboard penetrations are usually installed early and forgotten about by the time the airtightness detailing is being finalised. By final fit-out, these penetrations are often buried behind finishes, making them expensive to access and reseal if missed.
Mistake 10

Fire-Stopping Interfaces

Fire-stopping and air-sealing aren’t automatically the same thing. A fire-rated penetration seal is tested for fire and smoke performance, not necessarily for air permeability, so this detail needs a product and installation method that satisfies both requirements at once, particularly in healthcare, high-rise, and life safety applications.

How to Stop These Leaks
Before They Cost You a Failed Test

Catch Them at Schematic Design, Not on Test Day

Every one of these 10 causes is dramatically cheaper to fix on paper than on-site. Reviewing drawings and defining the air barrier line before construction starts, the second step in Aerotight’s process, catches most of these before a single penetration is cut.

Site Audits Catch What Drawings Can't

Drawings don’t account for what actually happens when six trades are on-site at once. Site audits during construction, carried out by qualified builders, catch the gap between the detail as drawn and the detail as installed, before it’s buried behind linings.

Frequently Asked Questions

What is the most common cause of air leakage in buildings?

Service penetrations, pipes, cables, and ducts passing through the envelope, are consistently the highest-frequency leak point, simply because there are so many of them on a typical project.

Can air leakage be fixed after construction is finished?

Yes, but it’s significantly more expensive once penetrations are buried behind finishes. Preliminary testing during construction identifies leaks while they’re still accessible.

Is fire-stopping the same as air sealing?

No. Fire-stopping products are rated for fire and smoke performance. Achieving both fire compliance and airtightness at the same penetration requires a detail and product suited to both.

Building airtightness inspection and blower door testing used to identify air leakage
Airtightness Guide

Airtightness Compliance: Visual Inspection Isn’t Enough

Home Airtightness Compliance: Why Passing Visual Inspection Doesn’t Guarantee You’ll Pass the Test Posted by Joel Symmans Key Takeaways A visual inspection checks whether seals ...
Read More →
Continuous airtightness membrane being sealed along a slab edge on site
Make-up Air Design

How to Seal Slab Edges Properly (Avoid First Pass Fails)

Home How to Seal Slab Edges Properly: The Details Costing Builders First Pass Compliance Posted by Joel Symmans Key Takeaways Most slab edge air leakage ...
Read More →
Diagram showing make-up air and exhaust balance in a building
Make-up Air Design

What Make-Up Air Design Is Actually Trying to Achieve

Home What Make-Up Air Design Is Actually Trying to Achieve Posted by Joel Symmans Key Takeaways The Core Purpose of Make-Up Air: Make-up air replaces ...
Read More →

Get a preliminary blower door test before your compliance test!

Find out which of these 10 details are leaking while they’re still cheap to fix. Book an appointment with Aerotight.

Need airtightness testing for compliance or project verification? Submit the form and our team will reach out to you shortly.

Name(Required)
This field is for validation purposes and should be left unchanged.